ASLAN CONSTRUCTION / BLOG
Construction and Renovation Quotations from Muğla to Antalya: From Survey to Handover

Start with a Clear Description of the Work
A useful construction or renovation quotation begins with a defined brief rather than a request for one total price. A new villa, a replacement kitchen, roof waterproofing and bespoke furniture require different preparation. When contacting Aslan Construction about a property between Muğla and Antalya, share the location, current photographs and your priorities. Approximate dimensions, drawings if available and a preferred starting period are useful too. The location, whether Kalkan, Kaş, Fethiye or elsewhere along the route, affects site planning and access. Photographs support an initial discussion but cannot replace inspections that the building needs. Without a clear scope, two headline prices may describe very different work. The process therefore starts by understanding the intended result. An initial enquiry is not a work order or a contract. Final arrangements require a separate, clear agreement.
Initial Discussion and Survey Arrangements
Discuss which spaces will change, whether the villa is occupied and when you hope to use it again. If you cannot attend, identify the person who will provide access and approve decisions. Share known leaks, earlier repairs and relevant information about existing services. The date, scope and any charge for a survey should be agreed separately. An enquiry does not automatically include a free or immediate site visit.
Site Inspection and Measurements
The survey considers more than decoration. Existing surfaces, connections, access and belongings that need protection affect the work. Kitchen and bathroom layouts must be considered alongside existing services. Roof and terrace investigations need to examine drainage and junctions as well as visible symptoms. Any specialist assessment should involve a suitably qualified person. Concealed conditions may remain uncertain until work is opened up, and those assumptions should be recorded in the quotation.
Define What Is Included and Excluded
Describe work by location and type. Removal, waste handling, preparation, installation, protection and final cleaning are separate activities, so the quotation should state which are included. A fitted kitchen may involve cabinet bodies, fronts, hardware, worktops and installation, each with a defined scope. Record owner-supplied products and work by other teams. This allows quotations to be compared against the same brief rather than a total alone.
Materials and Technical Decisions
Where possible, agree samples, product references, dimensions and finishes. Timber treatment, stone selection, cabinet hardware and suitability for an outdoor location can change both cost and everyday use. If a product is undecided, identify the allowance or assumption and explain how a different selection would be priced. Any required design or approval work should have clear responsibilities and an agreed place in the programme.
Pricing, Taxes and Validity
Labour, materials, transport and site-specific requirements all influence pricing. Where quantities are measured later, specify the measurement basis. State whether taxes, delivery and specialist equipment are included. Record the quotation date, validity period and the selections on which it depends. Separate fixed-scope items from work that remains provisional. This article does not promise one universal price, tax rate or payment schedule; the terms belong in the project-specific quotation.
Approval, Payments and Programme
Before work begins, confirm the scope, selections, payment stages and target programme in writing. Orders, manufacturing lead times and the sequence of different trades should fit together. Share any rental commitments or travel dates early. Payment amounts and the milestones to which they relate should be agreed for the particular job. A preliminary message should not be treated as confirmation of every construction detail.
Changes During the Work
A concealed defect or a new request can change the original scope. Describe the additional work and its cost and timing implications before proceeding. Current photographs can help explain the options. For owners living abroad, identify who may approve each decision. Keeping a written record of variations helps avoid a collection of unconfirmed additions at handover.
Inspection, Snagging and Handover
Completion involves more than achieving an attractive photograph. Review agreed items, visible finishes, dimensions and the operation of relevant doors, drawers and mechanisms. Record outstanding items and discuss a plan for completing them. Provide maintenance information and applicable product documents according to the agreed scope. Warranty terms should be written for the relevant product or work rather than assumed to be unlimited. Review the final account against the original scope and approved variations.
What to Send with Your Enquiry
For a project in Kalkan, Kaş, Fethiye or along the Muğla–Antalya route, send the location, wide and close-up photographs, approximate measurements, a work list and preferred dates. A budget range can help the discussion of priorities and alternatives. If you live abroad, include an on-site contact and suitable times to speak. Aslan Construction can then discuss the next appropriate step. Use the contact form, telephone or WhatsApp; an initial enquiry does not replace the survey, final quotation or agreement needed for the work.
Explore the Project
The photographs illustrate work from our own project archive. Each property has different dimensions, conditions and priorities, so material and installation decisions need an individual review. Share photographs, a location and your requirements to begin a discussion.